Civil Engineering & Surveying :: 419.586.1430
Building Relationships. Creating Solutions.

Rapid Development – Woodland Estates Fort Loramie, OH

Project Data
Client: Rapid Development Inc.
Completion Date: 2015
Site Details:
17 Acres
23 Parcel Subdivision
Services:
Field Investigation
Site and Utility Design
Stormwater Management
Permit
Bidding
Survey

Rapid Development hired Access Engineering Solutions to develop a 23-parcel subdivision on a 17-acre plat of land. In consultation with the owner, we determined the general scope, extent, and character of the project.
Our final site design included but was not limited to specifications on water, sanitary, storm sewer and grading plans. Erosion control and other details required by the Ohio EPA were also completed.
We provided the owner with a preliminary cost estimate for the construction of the sub-division and helped with the bidding process for the project. Construction staking was included for the streets and underground utilities.